aboutsummaryrefslogtreecommitdiff
path: root/fs/xfs/quota/xfs_dquot_item.c
diff options
context:
space:
mode:
authorHiroshi Shimamoto <h-shimamoto@ct.jp.nec.com>2007-09-19 23:34:46 +0200
committerIngo Molnar <mingo@elte.hu>2007-09-19 23:34:46 +0200
commit9c95e7319ba98585ebb6d304eca2d56f401ed70c (patch)
treeb650a409da9c1e1feb289cfb16ce2fa05c602216 /fs/xfs/quota/xfs_dquot_item.c
parent1799e35d5baab6e06168b46cc78b968e728ea3d1 (diff)
sched: fix invalid sched_class use
When using rt_mutex, a NULL pointer dereference is occurred at enqueue_task_rt. Here is a scenario; 1) there are two threads, the thread A is fair_sched_class and thread B is rt_sched_class. 2) Thread A is boosted up to rt_sched_class, because the thread A has a rt_mutex lock and the thread B is waiting the lock. 3) At this time, when thread A create a new thread C, the thread C has a rt_sched_class. 4) When doing wake_up_new_task() for the thread C, the priority of the thread C is out of the RT priority range, because the normal priority of thread A is not the RT priority. It makes data corruption by overflowing the rt_prio_array. The new thread C should be fair_sched_class. The new thread should be valid scheduler class before queuing. This patch fixes to set the suitable scheduler class. Signed-off-by: Hiroshi Shimamoto <h-shimamoto@ct.jp.nec.com> Signed-off-by: Ingo Molnar <mingo@elte.hu> Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Diffstat (limited to 'fs/xfs/quota/xfs_dquot_item.c')
0 files changed, 0 insertions, 0 deletions