aboutsummaryrefslogtreecommitdiff
path: root/COPYING
diff options
context:
space:
mode:
authorDmitry Adamushko <dmitry.adamushko@gmail.com>2007-10-15 17:00:13 +0200
committerIngo Molnar <mingo@elte.hu>2007-10-15 17:00:13 +0200
commit08ec3df5109e0555da5b9deb4382fd29733c852c (patch)
tree4739cd8a9b37b9d5482f88db3c8cdc78b07a8a98 /COPYING
parent647e7cac2d215fb8890f79252d7eaee3d6743d66 (diff)
sched: fix __pick_next_entity()
The thing is that __pick_next_entity() must never be called when first_fair(cfs_rq) == NULL. It wouldn't be a problem, should 'run_node' be the very first field of 'struct sched_entity' (and it's the second). The 'nr_running != 0' check is _not_ enough, due to the fact that 'current' is not within the tree. Generic paths are ok (e.g. schedule() as put_prev_task() is called previously)... I'm more worried about e.g. migration_call() -> CPU_DEAD_FROZEN -> migrate_dead_tasks()... if 'current' == rq->idle, no problems.. if it's one of the SCHED_NORMAL tasks (or imagine, some other use-cases in the future -- i.e. we should not make outer world dependent on internal details of sched_fair class) -- it may be "Houston, we've got a problem" case. it's +16 bytes to the ".text". Another variant is to make 'run_node' the first data member of 'struct sched_entity' but an additional check (se ! = NULL) is still needed in pick_next_entity(). Signed-off-by: Dmitry Adamushko <dmitry.adamushko@gmail.com> Signed-off-by: Ingo Molnar <mingo@elte.hu> Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
Diffstat (limited to 'COPYING')
0 files changed, 0 insertions, 0 deletions